top of page


maintenance works for Yellow Fin
Multiple ship repair and maintenance works completed for Yellow Fin, including rudder & shafting, generator overhaul, and air compressor works.
The vessel Yellow Fin underwent a series of essential ship repair and maintenance works at Goa Shipyard Ltd. These included: Rudder & Shafting (Work Order 503125 dated 25.06.2020) carried out between 30-07-2020 and 13-12-2020; Generator Overhaul (Work Order 521188 dated 02.06.2020) from 12-07-2020 to 20-04-2021; and Air Compressor Work AWRF III for the Coast Guard (Work Order 503130 dated 04.07.2020) completed between 04-07-2020 and 18-07-2020. Each of these repairs ensured optimal performance, operational safety, and extended service life of the vessel.