Maintenance Project for Triton Tug and Charlie Boats C-433 & C-439 (Indian Coast Guard)

Maintenance of triton tugs and charlie Boats (Indian Cost Gaurd).

1. CHARLIE BOATS C-433 & C-439 (Indian Coast Guard)

  • Client: Indian Coast Guard (Commissioned and maintenance at Goa Shipyard Ltd)

  • Work Order No.: 503113 dated 27.05.2020

  • Project Duration: 27.05.2020 – 16.06.2020

  • Scope of Work: Complete overhaul of pump system.

  • Description: AC and AHU AC plant servicing, a comprehensive survey of the hull, both internal and external, was conducted. These works ensured reliable climate control systems, structural soundness, and continued operational readiness of both vessels.




2. TRITON TUG

  • Client: Triton

  • Work Order No.: 

    • MFG-1021-006 dated 19.10.2021

    • TE-1121-006 dated 30.11.2021

    • TE-1221-003 dated 20.12.2021

    • TE-1221-007 dated 28.12.2021

    • TE-0222-004 dated 17.02.2022

    • TE-0322-044 dated 31.03.2022

  • Project Duration: Starting from 2021 to 2022

  • Scope of Work: Main Engine & Machinery Repairs

  • Description: The tug at Triton underwent a series of maintenance and repair works for its main engine and associated machinery. The combined scope of work focused on restoring the tug’s propulsion system and critical onboard machinery to ensure peak performance and operational reliability.

Project Gallery

St. Andrew's Residency, Block B, Shop No 02, opposite Kadamba bus stand, Mundvel, Vasco-Da-Gama, Goa, 403802.

  • Whatsapp
  • Facebook
  • Linkedin
  • Instagram

©2020 by VINAYA CORPORATION

bottom of page