Engineering Installations of Rudder, Shafting and Stern & Steering gear
Engineering installations of rudder, shafting and stern & steering gear in fuel barge, LPG carrier1 and tug vessels
1. FUEL BARGE (Timbo Yard)
Client: Timbo Dry Dock
Work Order No.: 169, dated 13.01.2017
Scope of Work: Shafting installation, steering arrangements, and mechanical assembly alignment.
Description: The fuel barge constructed at Timbo Yard underwent complete shafting and engineering works, including installation and alignment of propulsion systems and steering arrangements. These works ensured the vessel’s operational readiness and safe performance for marine fuel transport.
2. LPG CARRIER 1 (Yard No. 1261)
Client: Goa Shipyard Ltd
Work Order No.: 404829, dated 31.03.2021
Project Duration: 31.03.2021 – 29.07.2023
Scope of Work: Comprehensive engineering outfitting activities.
Description: LPG Carrier 1 was constructed for the secure transport of liquefied petroleum gas. The engineering outfitting scope included installation of safety systems, piping networks, and mechanical assemblies critical for hazardous cargo operations. The project was delivered successfully, enhancing maritime infrastructure for LPG transport.
3. TUG VESSELS (Yard Nos. 1264, 1265, 1266)
Client: Goa Shipyard Ltd
Work Order Nos.: 405299, 405300, 405301, all dated 22.12.2023
Project Duration: 22.12.2023 – 27.04.2024 / 30.04.2024
Scope of Work: Stern Gear (Shafting), Steering Gear, and associated engineering installations.
Description: Three tug vessels were outfitted with complete stern gear, steering gear, and other engineering installations to support towing, harbor operations, and auxiliary naval duties. Delivered between April 27 and April 30, 2024, these vessels strengthen the operational support capacity of the Indian Navy and Coast Guard fleets.